Many EV charger installations require a permit and an inspection, but the rules are set locally and vary widely. Some jurisdictions require permits for every new circuit, while others require them only for certain kinds of work. Rules vary by location, so check with your local building department before the work begins to learn what applies to your home.
Why rules vary
Electrical permitting in the United States is generally handled by cities, counties or other local authorities. Each may adopt a different edition of the electrical code, with its own amendments. Requirements can also depend on the type of work, such as a new circuit, a new outlet, a panel upgrade or a plug-in connection to an existing outlet. Your jurisdiction may have additional rules about placement, labeling or equipment.
What a permit process usually involves
- Submitting plans or a written description of the planned work.
- Having a licensed electrician or qualified contractor perform the installation.
- Scheduling one or more inspections while the work is in progress or after it is complete.
- Receiving final approval before the system is put into use.
The specific steps, documents and timelines differ by location, so ask your building department to walk you through the process.
Who usually handles the permit
In many cases the licensed electrician applies for the permit, since they are responsible for the work. Homeowners may also be allowed to pull a permit for their own property, depending on local rules. Confirm who is responsible before work starts so there are no surprises at inspection.
Why inspection matters
An inspection confirms that the wiring, breaker size, grounding and mounting meet the code that applies to your home. Work done without a required permit may need to be opened up later, and it can complicate insurance claims or the sale of a home. Checking early is much easier than correcting later.
Questions to ask the building department
- Is a permit required for an EV charger on a new circuit, a new outlet or a hardwired unit?
- Does the work need an inspection, and at what stages?
- Are there rules about the charger location or equipment?
- Who may apply for the permit?
How this applies to EVIQO chargers
EVIQO chargers can be installed in many locations, but the permit and inspection requirements for your project depend on where you live and on the type of installation. Plug-in 40A (9.6 kW) NEMA 14-50 models and hardwired 48A (11.5 kW) models may fall under different rules, so confirm the requirements with your local building department and your licensed electrician before you order. EVIQO orders start with a request that includes your name and phone number, and a manager then confirms delivery, warranty and payment.